Oak Ridge National Laboratory (DOE)
MSRE Design and Operations Report, Part VIII: Operating Procedures
Report · written 1 January 1966 · released 1 January 1966
Why this matters
The operating procedures for Oak Ridge's Molten-Salt Reactor Experiment, which ran from 1965 to 1969 (report ORNL-TM-908). This series is the main body of real operating experience behind today's molten-salt and thorium reactor startups. Engineers still mine these scans for practical details that never made it into journal papers.
Read the original
https://www.osti.gov/biblio/4447572
Hosted by OSTI.GOV
Tags
Part of a collection · step 10 of 15
The Nuclear Paper Trail
The civilian road not taken: molten-salt reactors.
Cite
Oak Ridge National Laboratory (DOE). "MSRE Design and Operations Report, Part VIII: Operating Procedures." 1 January 1966. Released 1 January 1966. https://www.osti.gov/biblio/4447572 (accessed via The Quiet Archive, QA-0028).